Back to Operations Log
diagram
infraPhase: production
ACTIVEOTDT
OT Digital Twin
Real-time industrial digital twin for geothermal plant operations
The Problem
No affordable remote monitoring solution for industrial OT environments in East Africa. Engineers fly to sites to read meters.
The Solution
Solo deployment of IBM Maximo Application Suite 9.1 on a 6-node OpenShift ROKS cluster (Frankfurt region). Monte Carlo failure prediction, LSTM anomaly detection, Unity XR visualisation layer.
Impact & Results
Presented at EAAAIW 2026 (CUEA). Validated by an Oil & Gas engineer. 30% PoC pathway to IBM Research Africa identified.
Tech Stack
IBM MAS 9.1OpenShift 4.19IBM Cloud ROKSwatsonx.aiPythonUnity XR
Metadata
- Date:Mar 2026
- Status:active
- Phase:production
External Links